Guide to file names. ## Brighness The LED duty cycle is ramped 1 to 100 by steps of 1 to verify that the brightness increases linearly with duty cycle. Integration = 12 ms Averages = 5 Files: CWled1brightness.txt, ...2... , ...3... note: integration at 5 ms resulted in unpredictable transients in the spectrum. 12 ms appears to be a minimum to guarantee stability with the admittedly unstable breadboard layout. ## Absorbance Absorbance is measured with the NIST standard. Integration = 50 ms Averages = 1 LED duty cycle 18% (CW) 100% (WW) (max is just on scale in both cases) Files: LED1_005.txt, etc. Files do not contain a wavelength axis. Wavelengths are provided in a separate file "wavelengths.txt". ## Duty Cycle Frequency LED Duty cycle frequency is varied Integration = 50 ms (CW) 50 ms (WW) {{CW has blue peak off scale}} Averages = 1 LED duty cycle 50 % (half on, half off) Monitoring 590 nm (CW) 625 nm (WW) Files: LED1_freq5_50.txt, etc. The following intervals were used and correspond to file names. 5 to 50 Hz by steps of 5 50 to 500 HZ by steps of 10 500 to 5000 Hz by steps of 50